- Location
- Shaw Plant 8S, 4401 Saint Andrews Road, Columbia, SC 29210 USA, United States of America
- Type
- Full-time
- Department
- IT
- Closing date
- Today
- Source
- Workday
Description
Job Title
Process Control Technician | 12-hour rotating shiftsPosition Overview
Provide support for the PI Reclaim department with a specific focus on the day-to-day operation and maintenance of the PI Reclaim Dept.
Essential Duties:
1.) Comply with all environmental procedures and programs.
2.) Take readings and check levels on PI support equipment.
3.) Responsible for maintaining condenser lines:
a) Cleaning of condensers which includes daily water flushes
b) Perform maintenance as necessary which also includes pulling & cleaning condenser tubes.
c) Inspect the completed job.
d) Inspect and clean the port holes and condenser catch pots.
e) Monitor coolant (glycol) levels in chillers and refill as needed.
4.) Extruder/Screen Changers
a.) Clean vent(s) as needed.
b.) Clean extruder catch pots.
c.) Clean/replace screens and hoses.
d.) Change screens on all screen changers as necessary. Record changes in change log.
5.) Troubleshoot the steam vacuum system as needed.
6.) Troubleshoot PI Reclaim for issues that may arise.
7.) Stage/move waste containers to appropriate location.
8.) Perform maintenance on PI Reclaim equipment, as necessary.
9.) Successfully start-up/string-up/shutdown pelletizer and troubleshoot as needed.
10.) Take necessary action to contain any off-quality material (viscosity, color, etc).
11.) Keep reliable and up to date records on all PI Reclaim equipment.
12.) Perform daily assignments and housekeeping.
13.) Clean and replace dust collectors and filters for cooling silo, vacuum pumps and dust collectors as needed to allow for optimal performance.
14.) Must be able to locate all equipment (pumps, vessels, valves, etc.) in the field in order to troubleshoot and correct problems.
15.) Evaluate PI reclaim conditions and make process corrections or changes as needed to maintain operation and performance.
16.) Collect color samples and test every hour and enter into quality form.
17.) Properly fill out the entire reading sheet.
18.) Load PI tankers as needed.
19.) Cover material handler job functions as needed.
20.) Inspect and operate a fork truck.
21.) Assist on PI Dept PMs, outages and overhauls.
22.) Fill out change log during shift.
23.) Weigh out/print out waste labels for waste boxes.
24.) Have an understanding of PI Dept equipment shutdown and start-up procedures.
25.) Locking and tagging of equipment for maintenance and construction.
26.) Be able to handle emergency situations: (Power outages, furnace outages, and instrument air malfunction).
27.) Attend shift communication huddles and make a good information exchange.
28.) Comply with procedures found in SMS.
29.) Work normally scheduled days adhering to starting and stopping times. Work overtime as required.
Work Shift
12 Hr rotating shift, Hrs fall to in punch day, Act Calendar, days & AM/PM start time changes in the rotation