- Location
- Texas, United States of America
- Type
- Full-time
- Experience
- 1+ years
- Source
- Workday
Description
Job Description
Position Title: Scaffold Builder Lead
Position Reports To: Foreman
Position Summary
A Scaffold Builder Lead directs a crew in the Foreman’s absence and responsible for directing personnel in the safe execution of the site-specific scope of work items outlined in the contract documents. According to sketches or blueprints, or while adhering to client, OSHA and company standards.
Essential Functions
Follow verbal directions as required to perform duties and responsibilities as listed below.
Heavy lifting will often be required to perform tasks.
Must be able to kneel, squat, and climb.
Must be able to perform required duties for extended periods of time.
Clean up of work area, supplies, materials, and equipment.
Communicate regularly with the Field Foreman with regard to issues and concerns on the job site.
Responsible for ensuring that work continues in the Foreman’s absence.
Comply with all Apache and client safety policies and programs.
Maintain a reliable attendance records
Always maintains a clean and safe work environment
Work unsupervised in an efficient and effective manner.
Able to wear all required PPE
Other duties as assigned
Education & Experience
Minimum 3-4 years of scaffold experience
Minimum 1 year experience with Apache.
Supervisory Experience (Preferred)
Knowledge, Skills, and Abilities
Able to give clear and concise instructions to multiple employees in the execution of work.
Possess the ability to maintain basic field equipment such as air compressors, man lifts, forklifts and etcetera.
Ability to interpret erection drawings.
Ensure that EVERY individual scaffold component is thoroughly inspected to verify good condition and integrity. Any defect encountered will require removal of services.
Ensure that all scaffolds are erected/dismantled in accordance with industry standards and manufacturer, OSHA, Apache and client’s recommendations/requirements.
Ensure that completed scaffolds are thoroughly inspected prior to tagging.
Update scaffold-tags at the beginning of each shift, or more frequently if required.
Transport materials to the site and erect the scaffold to the dimensions required
Utilize fall protection to secure yourself, tools and materials
Hammer material to each locking section
Erect scaffolding, install ladders, handrails, platforms, catwalks needed in order to access work area
Must maintain a positive attitude with crew members.
Ensuring good housekeeping is being performed throughout the entire project - inside & outside.
Work Conditions/Physical Demands
Remaining in a stationary position, often standing, or sitting for prolonged periods.
Light work that includes moving objects up to 20 pounds.
No adverse environmental conditions expected.
Must be able to work in high noise volumes, toxic or caustic chemicals, fumes, airborne particles, dusty conditions, hazardous machinery, precarious places, proximity to other employees.
Background Check Requirements
Drug Program
All employees at made aware that Apache has a comprehensive drug/ alcohol policy and program in place, which includes random testing