Project Director
Airliquidehr
·Today
- Location
- Hangzhou EC - Engineering, China
- Type
- Full-time
- Seniority
- Director
- Closing date
- Today
- Source
- Workday
Description
液化空气工程与制造中国作为液化空气工程与制造事业部的一员,伴随液化空气(杭州)有限公司于1995年成立,标志着集团的工程与制造业务正式进入中国。液化空气工程与制造中国将本地资源与集团的尖端技术有效结合,为各行各业的客户提供低排放、低能耗和高性价比的生产装置,从而助力中国企业实现转型和升级。同时,公司也致力于为员工、社区和中国社会创造长期价值。
Once the project is awarded and handed over to the Project Execution phase, the E&C Project Director / E&C Project Manager is responsible for overall EPC Project Execution,optimizing continuously to deliver the EPC project in line with the safety, cost, schedule and reliability as approved by AL RIC. He/she is also actively supporting the OPD (AP) to ensure excellence in successful investment delivery, AL commitments and end-customer relationship, when applicable.
When the execution phase is being finalized the E&C Project Director / Project Manager will ensure the Preliminary acceptance certificate is signed between E&C and Operations; from then the subsidiary plant manager becomes responsible for plant production. (note: The safety management leadership (incl. including the management of the Safe Work permits (SWP)) are transferred to the Operation team at the FIP between E&C and Affiliate, unless agreed otherwise.
您将如何贡献和成长?
During the development phase up to the Handover to Execution:
1. Support the E&C proposal manager to coordinate/develop the most competitive execution and sourcing strategy (notably packages/involvement from affiliates), adapted to the final customer requirements, support under Proposal manager's coordination with the following
2. Validating proposal information, project execution related procedures / interface & site management, requirements necessary for installation (land, utilities, storage & prefabrication area...) to be fully integrated into the project definition, scope and execution
3. Review & evaluate the overall performances of the proposal (budget, planning, scope, final technical solution, ...) before the B meeting. Coordinate with related departments to evaluate the availability of the resources and competences. Initiate actions if any gaps.
4. Inputs & review of overall project risks evaluation and be force of proposition to mitigate risks
5. Double check the consistency / identifications of gaps between the E&C technical & commercial offers and final Gas contract and E&C-Affiliate contract
6. Participate in cost estimation / vendor costs clarification notably site activities and challenge all the stakeholders to ensure the best AL competitiveness
7. Review the solution and execution strategy is set up in line with compliance to AL rules and systems and any relevant external rules and guidelines
During the Execution phase up to Handover to Operations:
1. Manage the Project Execution with Excellence in order to ensure overall performances, as defined during the Handover (Technical Performances, safety, Capex, budget, schedule, reliability, Scope, Risks,...)
2. Contract, manage, optimize and challenge external/internal suppliers, including internal E&C to optimize and meet the performance (budget, schedule, ..) within the approval received from RIC
3. Ensure the submission schedule and content of documents necessary for permits application is known in time and met, to ensure overall FIP met in line with the gas contract, or at least to ensure overall FIP met in line with the contract between E&C and Affiliate
4. Coordinate interactions between different E&C stakeholders, other partners and other integrated team members to meet the performance up to the transfer to Operations
4A. including to ensure clear interfaces alignment take place between all involved parties to ensure interfaces/ supply is fully aligned / covering the total scope, including Proper management (technical / project) with end user CDI ( interfaces design reviews ) to be timely managed by EPC Project director.
4B. PD and his team communicate regularly with the final customer's dedicated person for technical and project related issues; in case of disagreement it shall be quickly escalated to the Owner Representative. PD to communicate in advance/timely with the Owner Representative /mgt to ensure alignment on next steps -> how to minimize the impact and who bore the already optimized cost impact, if any
5. Insure Excellence in Construction & Pre commissioning
6. Evaluate resources and required skills to ensure excellence in the Execution
7. Manage Changes and support the OPD(or AP) for final customers negotiation, if needed
8. Follow risks and mitigation plan in aligned manner with OPD (one process)
9. Ensure the capitalization/ lesson learnt collection and consolidation for the project and hand-over to the designated company resources in line with company development objectives. (eg. strategy / schedule / vendors selection .. for future projects).
Safety / Quality Assurance / Risk Management/ IMS and general activities
1. Ensure that developed execution strategy and people assignment will address all necessary aspects related to Safety, Quality and Risk Management & IMS
2. Ensure Safety/Quality/Risks management processes are applied during the entire execution phase
3. Prepare and conduct the capitalization review
您是合适的人选么?
- General knowledge of project management tools and techniques.
- Knowledge of EPC capital project definition and execution. Technical knowledge consistent with the project scope / General knowledge of Mechanical, Electrical tools, Operations, Controls of process equipment.
- Ability to understand applicable specifications and standards. Industrial Management System familiarity.
- Cost and budget Management abilities.
- Results oriented. Influential leadership skills, Interpersonal and communication skills. Very organized person. Good adaptation skills. Safety oriented. Commercially smart. Able to work under pressure. Good prioritization.
- Autonomy on decisions. High reactivity and proactivity at same time. Teamwork and networking.
- Mobile geographically in APAC countries
- Proficient English communications
关于液化空气集团 液化空气集团 —— 全球工业与健康领域气体、技术和服务的领导者之一 ;业务遍及78个国家/地区 ;员工约64,500人 ;为380多万名客户与患者提供服务。氧气、氮气和氢气是生命、物质及能源不可或缺的小分子。它们象征着液化空气的科学疆域 ;自集团1902年成立以来 ;始终位于其业务的核心。
多样化造就了我们的业绩 在液化空气 ;我们致力于建立一个多元化和包容性的工作场所 ;拥抱来自全球的员工、客户、患者、社区利益相关者和文化的多样性。我们欢迎并考虑所有合格申请人的申请 ;无论他们的背景如何。我们坚信 ;多元化的组织为人们提供了展示个人和集体才能的机会 ;它有助于培养我们的创新能力 ;通过践行我们的基本原则、为我们的成功而努力并在不断变化的世界中创造一个有吸引力的环境。