Hiring.Camp

2nd Shift Final Test Technician

Employeeownedbrands

·

Yesterday

Location
Crystal Group, Inc., United States of America · Cedar Rapids, IA
Workplace
Onsite
Type
Full-time
Department
IT
Education
Associate
Source
Workday

Description

Job Description:

Job Title: 2nd Shift Final Test Technician

Reports to: Final Test Supervisor 

Department: Operations 

Work Model: Full-time, on-site  No Travel Required 

Schedule: Monday – Thursday, 3:00 PM - 1:00 AM

 

Company & Benefit Information

At Crystal Group, we do hard things – designing and building rugged tech and tech solutions that provide predictable performance in the world’s most unforgiving environments. As a 100% employee-owned company, here you take extreme ownership of your role and work and invest in your own success and that of your teammates. Together we use a zero limits approach to wow our customers.  

 

Crystal Group offers a comprehensive benefits package including: 

  • Medical/dental/vision insurance 

  • Paid time off 

  • Tuition reimbursement 

  • Wellness programs 

  • Participation in our Employee Stock Ownership Plan (ESOP) 

  • On-Site Gym 

Job Summary

The Final Test Technician Role is responsible for verifying both hardware and software functionality at the end of the manufacturing process. This role is critical to the success of our company’s mission, as it serves as one of the final checkpoint to ensure that products meet quality standards before they are shipped to customers. By identifying and addressing any last-minute issues, the this role helps maintain our reputation for delivering reliable, high-quality products. 

Essential Functions 

The Final Test technician is responsible for performing functionality testing and system stress testing on hardware and software at the end of the manufacturing process. Key responsibilities include: 

  • Executing comprehensive test procedures to verify product performance. 

  • Identifying and troubleshooting any hardware or software issues. 

  • Set Up and Maintain Test Equipment/assets 

  • ensuring each unit meets quality and reliability standards before shipment.  

  • Accurately Analyze and document test results, observations, and anomalies. 

  • Support product Development by providing feedback to design teams based on manufacturability and testing outcomes. 

Scope and Complexity 

This role requires a high level of autonomy, with technicians working independently based on a set schedule. Self-motivation and the ability to manage tasks without direct supervision are essential. Technicians make routine decisions related to testing, troubleshooting, and escalating issues when needed. While not a formal leadership role, it requires ownership, accountability, and occasionally mentoring less experienced team members. 

Tools, Technology, or Equipment Used 

  • Final Test Technicians routinely use electronic test equipment such as oscilloscopes, multimeters, signal generators, power supplies, and specialized test fixtures. 

Knowledge, Skills and Abilities 

  • Identifies common test failures, performs basic diagnostics, and communicates findings clearly. 

  • Can interpret basic wiring diagrams, test procedures, and technical documentation to perform tasks correctly. 

  • Comfortable using test software, Microsoft Excel, and internal systems for tracking and documentation. 

  • Shares test results, issues, and updates with team members and engineers clearly and professionally. 

  • Able to prioritize tasks and manage workload efficiently to meet daily schedules. 

  • Accurately records test results, logs defects, and completes reports as required. 

  • Ensures accuracy in test setups, data entry, and following procedures to maintain quality standards. 

  • Ability to perform simple voltage, continuity, and resistance checks using standard equipment. 

 

Required Qualifications

  • Must be a US Person (US Citizen, person granted US Permanent Resident Card or any individual who is granted status as a "protected person”) 

  • Education requirements: GED/High School Diploma 

  • Two or more years of hands-on electronics experience  

Preferred Qualifications

  • IPC certification 

  • Associate degree or technical diploma in Electronics, Electrical Engineering Technology. 

Working Conditions 

Work is primarily performed in a manufacturing environment with consistent exposure to the manufacturing floor and testing environments. May require lifting up to 25 lbs and standing for extended periods of time.  

EEO Statement 

Crystal Group, Inc, maintains a program of equal employment opportunity designed to ensure that employment and advancement opportunities are made available to all employees and applicants on the basis of individual qualifications and without regard to race, religion, color, creed, national origin, disability, age, sex, genetic information, military status, or any other classification protected by federal, state, or local laws. 

Offer Contingency 

All job offers are contingent on the applicant successfully completing the background check and drug screen. 

 

This job description is intended to describe the general nature and level of work being performed by individuals assigned to this position. It is not intended to be an exhaustive list of all responsibilities, duties, and skills required. Management reserves the right to modify, add, or remove duties and to assign other responsibilities as necessary. Employment with Crystal Group remains at-will. 

EEO IS THE LAW

EEO IS THE LAW (Spanish)

Pay Transparency Nondiscrimination Provision

Pay Transparency Nondiscrimination Provision (Spanish)

Skills

Excel

Similar Jobs

18

FINAL ASSEMBLER 2nd SHIFT / ENSAMBLADOR FINAL 2ndo TURNO

AKG North America · Mitchell, SD

1 week ago

Quality Assurance QA Final Inspector - 2nd Shift Opportunity

Acero Precision · West Chester, PA

3 weeks ago

Light Assembly - Final Inspector - 2nd Shift

Default · Sheboygan, WI

1 month ago

Propulsion Technician - Raptor Chamber & Nozzle Assembly & Final Assembly - 2nd Shift

Spacex · Hawthorne, CA +1

1 month ago

Final Assembler - 2nd Shift

Eaton · Waukesha, WI,US, US

1 month ago

Final Processor (2nd shift)

MicroPort Job Board · Arlington, TN · onsite

1 month ago

PRODUCTION OPERATOR (FINAL ASSEMBLY) 2nd Shift

WEG Transformers USA · WASHINGTON, MO

1 month ago

Final Inspection - 2nd Shift - 90-Day Increase Eligible

Ttmtech · Santa Ana, CA, United States of America

1 month ago

Final Assembly - 2nd Shift

Vibration Mountings & Controls · Houston, TX

2 months ago

Final Inspector - 2nd (Night) Shift

Montana Precision Products LLC · Butte, MT

Today

MV Final Production Operator 2nd Shift

Abb · Pinetops, North Carolina, USA, United States of America · Onsite

5 days ago

FINAL INSPECTION OPERATOR - 2nd Shift Afternoons

American Standard Circuits LLC · West Chicago, IL

6 days ago

MV Final Production Operator 2nd Shift

Abb · Pinetops, North Carolina, USA, United States of America · Onsite

1 week ago

Final Assembly Technician 2nd Shift

ZIEHL-ABEGG, INC · Winston-Salem, NC, USA

2 months ago

Final Grinder High/Lift - 2nd Shift

Smithfieldfoods · St Charles IL Plant, United States of America

1 month ago

Propulsion Technician - Raptor Chamber & Nozzle Assembly & Final Assembly, Level 4/5 - 2nd Shift

Spacex · Hawthorne, CA +1

6 days ago

FINAL ASSEMBLER- A/C (DT-2nd Shift)

WEG Transformers USA · WASHINGTON, MO

1 week ago

MV Final - Production Operator - Urethane Casting - 2nd shift

Abb · Pinetops, North Carolina, USA, United States of America · Onsite

4 weeks ago