Construction Scheduler
Embark Recruiting Solutions
·- Location
- Columbus, OH, USA
- Type
- Full-time, Contract
- Department
- Marketing
- Source
- RecruiterFlow
Description
Title: Construction Scheduler
Location: Columbus, OH
Duration: Direct Hire
Our client, located in Columbus OH, has an immediate need for a Scheduler. This is a direct hire / full time position. Details are as follows:
- The scheduler shall have an in-depth knowledge of construction practices and sequencing
- The construction scheduler shall review construction schedules with supporting documentation and provide reports to project team
- Analyze scheduling scenarios to assist the project team
- The scheduler shall demonstrate the ability to prepare a Critical Path Schedule (CPM)
- Assist the Project Team in evaluating and monitoring the Contractors progress schedule as well as consulting and troubleshooting issues throughout the construction of the project
- The scheduler shall have excellent computer skills with in-depth knowledge of Primavera P6 scheduling software and Microsoft Project.
- Ability to utilize Microsoft Office products, specifically Word and Excel will be required
Experience:
- Must have a minimum of 3-5 years’ scheduling experience
- BS degree in Civil Engineering or Building/Construction Management is preferred
- Strong background using Primavera P6 scheduling software
- Experience with construction schedules for the design-build phase of the projects
- Critical Path Method (CPM) scheduling knowledge/experience and the ability to analyze schedules to determine duration and logic issues
- Experience developing detailed resource loaded design and construction schedules, and preparing progress/status reports and performance of earned value analysis
- Experience with time impact analysis
- Construction claims and change order experience is preferred
- Construction scheduler should have experience integrating the construction schedule into the master schedule
- Candidate must be able to demonstrate excellent verbal and written communications skills
- The scheduler shall have excellent computer skills with in-depth knowledge of Primavera P6 scheduling software and Microsoft Project.
- Ability to utilize Microsoft Office products, specifically Word and Excel will be required