- Location
- Remote, USA · Remote - US
- Workplace
- Remote
- Department
- Government Affairs
- Seniority
- Director
- Source
- Greenhouse
Description
Antora builds and deploys thermal energy storage to power always-on industrial operations and data centers with low-cost energy. Factory-built in California, Antora’s thermal batteries deliver reliable and cost-effective heat and power for industrial loads of any size. Antora is electrifying global industry while supporting U.S. manufacturing jobs, lowering costs for energy consumers, and enhancing the competitiveness of American industry.
We are growing our company with people who put team and mission first, value connection through laughter and joy, and build with humility and openness. We are committed to continue building a diverse, passionate, and creative team dedicated to a future where every industrial facility, everywhere on earth, is powered by abundant, clean, low-cost energy.
Position Summary
Antora is hiring a Director of Grid Policy to lead regional and state-level regulatory advocacy on transmission, interconnection, and resource adequacy issues that are critical to the commercial success of Antora's long-duration storage and 24/7 energy products. This person will manage high-level negotiations and policy advocacy with RTOs, public utility commissions, and state legislatures, partnering closely with Antora's policy team and the energy commercial team (led by the Director of Energy) to ensure Antora's technology receives accurate, favorable regulatory treatment as the company scales into new products, states, and RTOs.
Roles & Responsibilities
- Lead advocacy and stakeholder/regulator negotiations on transmission interconnection, resource adequacy, ELCC, microgrid, and long-duration storage policy issues across multiple RTOs and states.
- Represent Antora in RTO stakeholder processes, FERC proceedings, and state PUC/legislative engagements (e.g., SPP, CAISO, and other RTOs as Antora expands).
- Partner with the energy commercial team to ensure Antora's storage and 24/7 energy products are accurately valued (RA/ELCC) so customers receive full value and are willing to pay accordingly.
- Develop and drive policy proposals in coordination with other clean energy stakeholders, building coalitions where interests align.
- Track and respond to relevant FERC rulemakings/orders (e.g., large-load interconnection 205 orders) and state proceedings (e.g., SB 943 in California).
- Collaborate with and support the head of regulatory and state affairs, who will remain engaged across these issues as the portfolio scales.
Key Qualifications
- 8–12+ years of specific experience in transmission, interconnection, and/or resource adequacy policy
- Demonstrated experience leading advocacy in an RTO, ISO, or FERC proceeding.
- Strong written and verbal communication skills tailored to political, regulatory, and policymaker audiences.
Additional Qualifications Desired
- Experience with storage procurement and resource adequacy or ELCC proceedings in any jurisdiction.
- Familiarity with long-duration energy storage procurement policy design.
Work Location: Remote, US
Salary Range: $213,000 USD - $255,000 USD
Salary Basis: Annual
Please note that the salary range listed above reflects Antora Energy's estimated pay for this position. The actual salary offered will be within the posted range and determined based on several factors including but not limited to a candidate's experiences, credentials and expertise, as they pertain to the position's requirements.
In addition to a competitive base salary, Antora Energy’s Total Rewards program includes equity compensation in the form of stock options, a premium health benefits package with life and disability insurance, a 401K plan with employer contributions, flexible spending accounts, and an industry leading paid-time-off policy that features flexible and inclusive holiday observance, as well as paid volunteer time off.
#LI-Onsite
