Sr. Mechanical Engineer - Turbines, HRSG, & BOP Thermal Engineer (PE)
Northmark
·Today
- Location
- Dallas-Victory Commons, United States of America
- Workplace
- Onsite
- Type
- Full-time
- Department
- Engineering
- Seniority
- Senior
- Visa
- Not sponsored
- Source
- Workday
Description
The Company
NorthMark Compute & Cloud (NMC²) is backed by dedicated leadership and investment, with a clear mission as it operates at the bleeding edge of technology. Its goal is to scale and enhance the high-performance computing (HPC) and cloud infrastructure that supports its clients' research, production, and delivery, enabling breakthroughs that shape the industries of tomorrow. Its engineers build critical infrastructure to eliminate friction in scientific research, simulations, analysis, and decision-making, accelerating discovery and driving faster innovation.
The Position
This role designs, integrates, and commissions the onsite generation systems that provide the only source of power and cooling to a campus with no utility grid backup, running on a fleet of aeroderivative gas turbines. The role owns three distinct programs built around that fleet: recovering usable turbine capacity through inlet air chilling, converting turbine exhaust heat into chilled water through absorption chilling for select halls, and running a combined cycle path where an HRSG drives a steam turbine for additional power. These are not one integrated system designed once; each carries its own equipment lead time, vendor relationships, and failure modes, and this role sequences and integrates all three without letting anyone become the campus's single point of failure. Combined cycle equipment in particular carries 18 to 24 month lead times, so early sequencing decisions determine whether generation and cooling capacity is ready when the halls come online. This role reports to the Principal Engineer / Design Authority, Power and Cooling Systems.
Responsibilities
Turbine Integration and Inlet Air Chilling
- Select, size, and specify aeroderivative gas turbines (for example GE Vernova LM6000 class or Baker Hughes NovaLT16 class) for base load power; own the inlet air chilling program to recover usable capacity, reconciling manufacturer indicative studies against confirmed measured performance
- Design fuel delivery infrastructure and dual fuel backup diesel systems; confirm gas supply capacity headroom independently of air emissions permit headroom, since the two are separate constraints. Design acoustic enclosures and vibration isolation to protect nearby server halls
Absorption Chilling and Combined Cycle Generation
- Design the program capturing turbine exhaust heat directly to drive absorption chillers for select halls, using thermodynamic simulation to confirm output across varying ambient and load conditions; coordinate with process piping on lithium bromide handling and material compatibility
- Design the HRSG downstream of turbine exhaust to produce steam for a steam turbine, treating this combined cycle path as distinct from the absorption chilling program, with its own performance model, schedule, and lead time risk
Balance of Plant and Emissions Coordination
- Design industrial piping (ASME B31.1/B31.3) connecting the generation yard to the data center, water treatment and chemical dosing for boilers and cooling towers, and auxiliary equipment (feed pumps, condenser pumps, compressors)
- Coordinate turbine controllers, HRSG dampers, and BOP valves into the master SCADA system for load sharing and emergency shedding; coordinate the NOx emissions budget and SCR system design with the site environmental function, and confirm turbine dispatch stays inside that budget
Commissioning and Performance Testing
- Witness Factory Acceptance Testing (turbine string testing, HRSG hydro testing) before equipment ships; lead mechanical execution of Level 4/5 Integrated Systems Testing proving backup triggers immediately on turbine loss without dropping critical IT load
- Verify mechanical systems handle step loads, sudden spikes or drops in campus power demand, without thermal shock to the HRSG or nuisance turbine trips
Gate and Milestone Accountability
- Gate 1/2, Scope/Concept: Turbine, HRSG, and BOP sizing basis support target reliability and PUE goals; inlet chilling, absorption chilling, and combined cycle programs sequenced against their distinct lead times.
- Gate 3, Design Freeze: BOP piping, water treatment, and SCADA integration fully coordinated with no open clash; emissions permit basis and NOx budget support the permit submission.
- Gate 4, Commissioning Readiness: FAT witnessed for turbines and HRSG modules; mechanical IST scripted and executed, confirming step load and turbine loss failover are tested.
- Gate 5, Final Acceptance: Demonstrated live failover (turbine trip, immediate backup pickup, no interruption to critical load) and complete O&M documentation delivered.
Requirements
- BS in Mechanical Engineering, ABET accredited or equivalent, required; MS in Mechanical, Thermal/Fluids, or Power Plant Engineering preferred
- PE license required, given engineer of record sign off on BOP piping design and commissioning documentation
- Training relevant to the ASME Boiler and Pressure Vessel Code and ASME B31.1/B31.3 required; manufacturer specific training on aeroderivative turbine platforms strongly preferred
- Proficiency with thermodynamic simulation software (Thermoflow, GateCycle, or equivalent) required
- Industrial power plant experience: Typically, 10 or more years of mechanical engineering experience with hands on design or commissioning of gas turbine generation, combined cycle, or absorption cooling systems, not solely conventional data center HVAC
- HRSG, combined cycle, and absorption depth: Experience designing HRSG systems and, separately, integrating turbine exhaust heat with absorption or steam turbine driven chillers as distinct programs with different lead times
- BOP system design: A track record designing ASME B31.1/B31.3 piping, water treatment, and heavy auxiliary equipment for a continuously operating industrial plant
- SCADA integration and step load judgment: Working experience coordinating turbine controllers, HRSG dampers, and BOP valve automation into a master SCADA system, and verifying systems against step load transients without HRSG thermal shock or nuisance trips
- Testing execution: Direct experience witnessing FAT and leading site level IST that proves failover under a real or simulated turbine trip without interrupting critical load
- Facility and cross functional fit: Data center, hyperscale, or campus scale mission critical experience strongly preferred; experience on a fully self-powered site with no utility grid backup is a strong plus. Able to communicate mechanical system risk clearly to project leadership
It is impossible to list every requirement for, or responsibility of, any position. Similarly, we cannot identify all the skills a position may require since job responsibilities and the Company’s needs may change over time. Therefore, the above job description is not comprehensive or exhaustive. The Company reserves the right to adjust, add to or eliminate any aspect of the above description. The Company also retains the right to require all employees to undertake additional or different job responsibilities when necessary to meet business needs.
Must be legally authorized to work in the United States without the need for employer sponsorship, now or at any time in the future.
Benefits & Perks:
Company-Paid Lunch Stipend: Lunch is provided via GrubHub
Company-Paid Benefits: 100% Employer-Paid Medical in our High Deductible Health Plan, Dental and Vision benefits for employees and their families, 16 weeks of Paid Parental Leave, Employee Assistance Program, Life insurance, Short-Term Disability and Long-Term Disability
401(k): Company will match 100% of your contributions up to 6%
Optional Employee-Paid Benefits: Medical insurance in our PPO plan and a variety of other benefits such as Health Savings Accounts (with Company Contribution!), Flexible Spending Accounts, Supplemental Life Insurance, Wellhub and more.
Time Off: 25 days of Paid Time Off plus 12 company holidays
EQUAL OPPORTUNITY EMPLOYER
NORTHMARK STRATEGIES LLC IS AN EQUAL EMPLOYMENT OPPORTUNITY EMPLOYER. THE COMPANY'S POLICY IS NOT TO DISCRIMINATE AGAINST ANY APPLICANT OR EMPLOYEE BASED ON RACE, COLOR, RELIGION, NATIONAL ORIGIN, GENDER, AGE, SEXUAL ORIENTATION, GENDER IDENTITY OR EXPRESSION, MARITAL STATUS, MENTAL OR PHYSICAL DISABILITY, AND GENETIC INFORMATION, OR ANY OTHER BASIS PROTECTED BY APPLICABLE LAW. THE FIRM ALSO PROHIBITS HARASSMENT OF APPLICANTS OR EMPLOYEES BASED ON ANY OF THESE PROTECTED CATEGORIES.