Hiring.Camp

Master Production Scheduler (MPS)

Kiongroup

·

Mar 12, 2026

Location
Guadalupe, Mexico
Department
IT
Education
Bachelor
Source
Workday

Description

The Master Production Scheduler owns the Master Production Schedule (MPS) and converts demand (customer orders, project milestones, and internal priorities) into a stable, capacity-feasible execution plan across manufacturing, kitting, staging, and shipment. The role balances customer promise, capacity constraints, and material availability while protecting plan stability and driving predictable execution.

This role is the “single point of accountability” for the what/when at the master-schedule level, enabling strong MRP, purchasing, and shop-floor scheduling decisions.

We offer:

  • Career Development

  • Competitive Compensation and Benefits

  • Pay Transparency

  • Global Opportunities Learn More Here: https://www.dematic.com/en-us/about/careers/what-we-offer/

Learn More Here: https://www.dematic.com/en-us/about/careers/what-we-offer/

Tasks and Qualifications:

Key Responsibilities

1) Own the Master Production Schedule (MPS) and plan stability

  • Build, publish, and maintain a rolling MPS (with longer-range outlook as required), including a frozen / slushy / liquid horizon to balance stability and responsiveness.
  • Create weekly (and as-needed) MPS updates that reflect true constraints and priorities; protect stability while managing controlled changes.
  • Drive MPS governance: clear rules for order release timing, schedule changes, and escalation paths.

2) Capacity-feasible planning

  • Translate demand into a schedule that is capacity-feasible across critical work centers and bottleneck resources (fabrication, assembly, paint, kitting, packaging, etc.).
  • Partner with Operations to validate routings, standard times, and capacity assumptions; proactively surface overloads and recovery options.
  • Use capacity evaluation and leveling practices/tools to avoid overload and improve resource utilization (SAP highlights that manufacturing planning can create capacity requirements that must be evaluated/leveled to prevent overload).

3) Materials + execution alignment (end-to-end)

  • Ensure Materials Planning and Purchasing are working from a current, credible MPS so supply plans and staffing plans are synchronized with what will actually be built/shipped.
  • Partner daily/weekly with Production, Kitting, Receiving, Warehouse, and Quality to manage constraints, shortages, and execution readiness.
  • Lead cross-functional “schedule alignment” cadence to confirm what ships, what builds, what kits, and why.

4) Priority management and scenario planning

  • Translate business priorities into an executable “must-build / must-ship” plan; recommend trade-offs when capacity or supply is constrained.
  • Run scenarios (expedite vs. re-sequence vs. split builds vs. alternate sourcing) and present recommendations with facts, risk, and cost/benefit.

5) Data integrity and planning system excellence

  • Maintain planning master data quality critical to MPS performance: lead times, calendars, work centers, scheduling parameters, and order policies.
  • Strong working knowledge of ERP planning (SAP preferred) and the discipline to drive clean inputs/outputs.

6) Performance management (KPIs) and continuous improvement

  • Track and improve schedule performance through KPI dashboards and structured problem solving. Common MPS expectations include monitoring schedule adherence, auditing compliance, and driving corrective actions.
  • Lead root-cause work on misses (late releases, shortages, rework, capacity constraints, data issues) and implement preventive actions.

Deliverables You’ll Own

  • Weekly/Monthly published MPS + exception list (constraints, shortages, risks)
  • Bottleneck capacity outlook + recovery actions
  • Order release plan (what gets released, when, and why)
  • Clear priorities translated into shop-ready execution (build/kit/ship)
  • KPI dashboard: schedule adherence, plan stability, OTIF/ship attainment, expedite drivers

Required Qualifications

  • Bachelor's degree in industrial engineering, Supply Chain, Operations, Business, or related field (or equivalent experience).
  • 5+ years in master scheduling / production planning / supply planning in discrete manufacturing or complex assembly environments.
  • Strong ERP experience (SAP PP/MM preferred) and advanced Excel skills
  • Demonstrated ability to plan and execute in a constraint-based environment (capacity + materials + priorities).
  • Proven cross-functional leadership
  • English proficiency (written and verbal) for a global environment.

Preferred Qualifications

  • APICS/ASCM certification progress or completed.
  • Experience in engineered-to-order manufacturing, project-based fulfillment, or high-mix/low-volume environments.
  • Strong change management and process improvement track record (planning governance, master-data discipline, scheduling cadence).

Success Metrics

  • Improved schedule adherence and reduced last-minute reschedules
  • Higher OTIF / ship attainment against committed dates
  • Increased plan stability inside the frozen horizon
  • Fewer expedites driven by planning/data issues (not true surprises)

Clear, repeatable prioritization and faster cross-functional decisions

Skills

ExcelSAPComplianceERPChange Management

Similar Jobs

29

MASTER PRODUCTION SCHEDULER

Rockwell Automation · Singapore Singapore (Rockwell) +1 · Hybrid

Today

MASTER PRODUCTION SCHEDULER

Rockwellautomation · China Shanghai (Hongmei) +1 · Onsite

4 days ago

Master Production Scheduler

Airbus · Broughton, United Kingdom · Onsite

1 week ago

Master Production Scheduler

Abb · Senatobia, Mississippi, USA, United States of America · Onsite

2 weeks ago

Master Production Scheduler

Rockwellautomation · Poland Katowice (Rozdzienska 49, Plant 1) · Hybrid

2 weeks ago

Master Production Scheduler

Rockwell Automation · Poland Katowice (Rozdzienska 49, Plant 1) · Hybrid

2 weeks ago

Master Production Scheduler

Leidos · 2685 Huntsville AL, United States of America

2 weeks ago

Master Production Scheduler

Leidos · 2697 Huntsville AL, United States of America

2 weeks ago

Master Production Scheduler

Leidos · 2686 Huntsville AL, United States of America

1 month ago

Master Production Scheduler

Eaton · Minden, LA,US, US

2 months ago

Master Production Scheduler (MPS) Planner

IFF · Sassenage, France +2 · Hybrid

1 week ago

Master Production Scheduler (Temp agency)

Airbus · El Puerto Sta Maria, Spain · Onsite

3 weeks ago

Principal Production Master Scheduler & Planner

Northrop Grumman · CALA02, United States of America

3 weeks ago

Principal Production Master Scheduler & Planner

Northrop Grumman · Commerce, CA,US, US

3 weeks ago

Expert Planning scheduler - Master Production Scheduler

Kiongroup · Guadalupe, Mexico

2 months ago

Expert Planning scheduler - Master Production Scheduler

Kiongroup · Guadalupe, Mexico

2 months ago

Master Production Scheduler (MPS)

Kiongroup · Guadalupe, Mexico

4 months ago

Global Production Planner/Master Scheduler 5

Lam Research · Simpang Ampat, Penang,MY, MY

1 week ago

Production Planner/Master Scheduler 3

Lam Research · Taoyuan City,TW, TW · Remote, Hybrid, Onsite

3 weeks ago

Production Planner/Master Scheduler 3

Ichor Systems · Singapore, SG

1 month ago

Production Planner/Master Scheduler 3

Lam Research

1 month ago

Production Planner/Master Scheduler 2

Lam Research · Simpang Ampat, Penang,MY, MY

1 month ago

Production Planner/Master Scheduler 3

Lam Research · Tualatin, OR,US, US

1 month ago

Production Planner/Master Scheduler 2

Ichor Systems · Singapore, SG · Onsite

2 months ago

Production Planner/Master Scheduler 4

Lam Research · Tualatin, OR,US, US

2 months ago

Production Planner/Master Scheduler 4

Lam Research · Simpang Ampat, Penang,MY, MY

2 months ago

Production Control - Master Scheduler

Blueorigin · MO - Blue Batteries, United States of America

2 months ago

Production Planner/Master Scheduler 3

Lam Research · MY-Batu Kawan [3620] (3622)

4 months ago

Production Planner/Master Scheduler 2

Lam Research · MY-Batu Kawan [3620] (3622)

4 months ago