Hiring.Camp

Materials Engineer

Air Products Careers

·

Jul 13, 2026

Location
Tainan TW(Nanke 9 Plant) (0L36), Taiwan · Kaohsiung, Kaohsiung City
Type
Full-time
Department
Engineering
Source
Workday

Description

At Air Products, we reimagine what’s possible. By tapping into the motivation of our people and our collective experience, we create the ideas and innovations that drive us forward. When we come together – where every voice is heard and everyone knows they belong and matter – we create solutions that launch people into space, support lifesaving care in hospitals, and enable the construction of groundbreaking, world scale production facilities.


Reimagine What’s Possible 



  • Follow company material management procedures to do the set-up in smart plant material system.

  • Weekly meeting with contractor for material delivery to site schedule and undated material shortage list to Project in timely.

  • Weekly meeting with Project and Expeditor for material status, set up Material Tracking list (ROS date, Arrived Date, MRR), advise Expeditor and Project of all items that must be expedited. (4 weeks lookahead plan).

  • For Pipe/Fitting, Gaskets and Electrical Cable, Material Controller Develop the BOM/DCN with margin for purchasing subject to the project stage, Construction Material Controller submit BOM/DCN with margin for purchasing to Site Construction manager for review. After reviewed, Construction Material Controller sends BOM/DCN with margin for purchasing to Project Procurement Manager and copy to Project Manager, Project Coordinator and Project Engineer Manager.

  • Full understanding of material delivery status and estimated/actual delivery date and quantity.

  • Laydown area planning, Supervise the unloading, unpacking and storage of delivered:

  • Material offloading (provide packing list to contractor), materials, operation process of Job Safety Analysis Lifting Procedure specifies, Electrical equipment requiring special or sensitive handling, All rotating equipment. Lifts involving two cranes (i.e. tandem lifts)

  • Inspect material for damage before off-loading from transport or taking receipt. If damage is found, complete a report Follow up with Corporate Logistics/Shipping Department, ensure that the workforce always comply with Air Products safety standards.

  • Collect the materials certificates hard-copy along with shipped with equipment/material, if no hard-copy, check VDR report from open text system for e-copy to print out.

  • Set up material receiving summary report. maintain material files by purchase order.

  • Material inspection with contractor and site construction engineer, Materials Quantity, Specification, Quality, Tag No., Arrange PMI Test (Monel, alloy steel), Issue NCN/OSD report to project.

  • Material issue to contractor per document approved by site construction engineer.

  • Per document approved by site construction engineer

  • Issue Materials Per Drawing.

  • Issue Materials Per Tag No.

  • Issue Materials Per PID Page and CWP work area.

  • Material protects.

  • Ensure all Air Products supplied sensitive materials are properly stored and protected. include transmitters, instruments, gauges, O2 cleaned valves and equipment, and all other sensitive material susceptible to weather damage or contamination. Space heaters must be connected, for temporary power, to equipment motors as defined by specification 600.002.

  • Verify the type of preservation that is required for each specific piece of equipment (e.g., N2 purge, vapor impregnated paper, coating or grease, connection of motor space heaters, etc.) and maintained during storage.

  • Record pressure once equipment delivery to site till the equipment is installed, including Purifier、vessel、surge drum、LIN tank、Main Heat Exchanger、Cooler、Vaporizer and Rotor etc.

  • Record all equipment spare parts of the storage status and duration with photo for each moving. Such as rotor、gear、bearing、motor.

  • Handover spare parts and tools, materials certificates documents to Globe operator.

  • For the left-over material, work with site construction Manager and project Manager, Home office manager to Coordinate the transfer of excess material between job site and suppliers Or Center warehouse and advise the field accordingly (shipping authority required).

  • Field Safety APT Report, Near Miss report (BSP task).

  • Material management weekly report to team member.

  • Lead site warehouse team member.



Founded in 1940, Air Products is a world-leading industrial gases company and has a proud history of innovation, operational excellence, with an unwavering commitment to safety and environmental stewardship. Working together, we are taking our passion and diverse backgrounds forward to reimagine what’s possible and generate a cleaner future for our customers, our communities, and the world.

Skills

Procurement

Similar Jobs

30

Materials Engineer

Booz Allen Hamilton · USA, VA, Lorton (8500 Cinder Bed Rd), United States of America

2 days ago

Materials Engineer

The PAC Group · Rhode Island

1 week ago

Materials Engineer

Costain Group · London, United Kingdom, GB · Onsite

2 weeks ago

Materials Engineer

Carrier · TX22: 1501 Distribution Drive, Fort Worth, TX, 76052, USA, United States of America · Onsite

2 weeks ago

Materials Engineer

Thekineticgroup · Anoka, MN, United States of America

2 weeks ago

Materials Engineer

"Standard Nuclear, Inc." · Oak Ridge, TN +1

2 weeks ago

Materials Engineer

Booz Allen Hamilton · USA, MI, Warren (6501 E 11 Mile Rd), United States of America

3 weeks ago

Materials Engineer

Mariana Minerals · San Francisco HQ · Onsite

4 weeks ago

Materials Developer

Tcbrands · TM - HQ - Huntington Beach, United States of America · Hybrid

1 month ago

Materials Engineer

Premier Group Recruitment · Exeter

1 month ago

Materials Engineer

Viable Engineering Solutions · Orlando, FL

1 month ago

Materials Engineer

Eaton · Marshall, MI,US, US · Onsite

1 month ago

Materials Developer

The Inside Job · Solihull +1

1 month ago

Materials Engineer

Agilent · Singapore-Yishun

2 months ago

Materials Engineer

Blue Bird · Macon, GA · onsite

2 months ago

Materials Engineer

Delta Diversified Inc · NJ

2 months ago

Materials Engineer

Delta Diversified Inc · NJ

2 months ago

Materials Engineer

Prysmiangroup · Indianapolis Tech Center, United States of America +2

3 months ago

Materials Engineer

Enterprise Wide · Woodstock, ON, Canada

3 months ago

Materials Engineer

Neuralink · Fremont, California, United States

3 months ago

Materials Engineer

Prysmiangroup · Indianapolis Tech Center, United States of America

4 months ago

Materials Engineer

Hill International · Italy

4 months ago

Materials Engineer

Helion Energy · Everett, WA · Onsite

5 months ago

Materials Engineer

KBR Careers · USA, Chantilly, 15020 Conference Center Drive, Suite 100, Virginia, United States of America

5 months ago

Materials Engineer

Jobyaviation · Marina, CA, US

1+ year ago

New Materials Reactor Design Engineer-Contract

Silananotechnologies · Alameda, CA +1

Today

Senior Civil/Environmental Engineer -Hazardous Materials and Building Abatement

AECOM · Edmonton, AB, Canada · Hybrid

Today

Laboratory Test Engineer - Materials

UL Solutions · 苏州市, 江苏省, 中国, CN

Yesterday

Associate Materials Engineer

Make the Turn · Callaway - Operations - CGC HQ Carlsbad, United States of America

Yesterday

Materials and Processes (M&P) Sr. Engineer, Crew Habitation – Lunar Permanence

Blueorigin · FL - Lunar Plant 1, United States of America +2

Yesterday
Materials Engineer at Air Products Careers | Hiring.Camp