Construction Scheduler | Mission Critical | Pittsburgh, PA | On-Site
Sargent Electric
·4 weeks ago
- Location
- Pittsburgh, PA
- Workplace
- Onsite
- Type
- Full-time
- Department
- Construction
- Seniority
- Mid
- Experience
- 2+ years
- Education
- Bachelor
- Closing date
- Today
- Source
- ApplyToJob
Description
We support the breadth of client needs, from routine 24/7 service and emergency restoration to their largest and most complex projects. Our proven safety record, technical depth, and longstanding client relationships have made us a partner of choice for Fortune 500 companies, leading general contractors, and EPC contractors.
We are seeking to hire a Construction Scheduler - Mission Critical - in our Pittsburgh, PA office.
POSITION OVERVIEW:
This full-time role supports the Mission Critical business unit by developing, maintaining, and managing detailed schedules for large-scale electrical construction projects from preconstruction through commissioning and turnover. The work location may be a project site or Mission Critical office, with local travel to project sites.
WHAT YOU'LL DO:
- Manage Project Schedules. Develop and maintain logic-driven schedules from preconstruction through commissioning and turnover
- Develop Primavera P6 Schedules. Maintain baselines, updates, activity logic, durations, milestones, constraints, critical path, and physical percent complete in Primavera P6.
- Drive Field-Based Updates. Work with project managers, superintendents, general foremen, and field teams so updates reflect actual conditions, installed progress, productivity, materials, access, and constraints.
- Integrate Electrical Scope. Schedule underground, grounding, raceway, cable tray, equipment setting, busway, cable installation, terminations, controls, testing, energization, commissioning, and turnover activities.
- Integrate Procurement and Prefabrication. Incorporate engineering releases, submittals, approvals, procurement, fabrication, long-lead deliveries, BIM coordination, clash detection, detailing, and material release activities.
- Analyze Critical Path and Risk. Identify critical and near-critical activities, sequencing conflicts, constraints, and emerging risks and support mitigation and recovery plans.
- Report Schedule Performance. Prepare critical-path analysis, baseline-versus-actual reporting, milestone tracking, variance analysis, look-aheads, and recovery schedules.
- Support Look-Ahead Planning. Translate the overall schedule into executable near-term plans aligned with manpower, materials, equipment, access, predecessor work, and field priorities.
- Coordinate with the General Contractor. Reconcile the electrical construction schedule with the general contractor master schedule and other trade schedules.
- Plan Commissioning and Turnover. Integrate testing, energization, startup support, commissioning, punch list, documentation, and phased turnover milestones.
- Communicate and Improve. Clearly communicate schedule status, risks, priorities, and required actions and help establish consistent Mission Critical scheduling standards and best practices.
- Champion Safety Culture. Lead by example in upholding safety standards and support best practices across field and office environments.
- Crave Learning. Grow through hands-on experience, training, and mentorship and actively engage in available development opportunities.
- Additional Responsibilities. Assume additional duties and responsibilities as delegated by Sargent Executive Management.
WHAT YOU'LL BRING:
- Bachelor of Science degree in Construction Management, Engineering, Architecture, Business Administration, or a related discipline; candidates with two or more years of relevant construction scheduling experience may receive equivalent consideration in lieu of a degree.
- Demonstrated ability to develop and maintain detailed construction schedules using Primavera P6.
- Ability to translate complex schedule information into clear, actionable information for project stakeholders.
- Experience with construction management applications such as BuildingConnected, Vista, Bluebeam, PlanGrid, Procore, ProjectSite, Primavera P6, and related applications preferred.
- Strong understanding of electrical construction sequencing in a multi-trade environment preferred
- Excellent written, verbal, interpersonal, computer, multitasking, and time-management skills.
- At least 2 years of construction scheduling, project controls, or construction management experience supporting electrical, mission critical, data center, industrial, or other complex construction projects.
- Experience scheduling large-scale electrical construction, data center, mission critical, industrial, or similarly complex projects preferred.
- Competitive compensation based on experience
- Established, growing company with a strong industry reputation
- Collaborative, team-driven environment
- Opportunity to directly impact project success and cost efficiency
EQUAL EMPLOYMENT OPPORTUNITY:
Sargent Electric Company is committed to providing equal employment opportunities to all qualified individuals in accordance with applicable federal, state, and local laws.